Posts

Showing posts from June, 2016

The trail foundation set!

Image
Block deployment The blocks the lift bag with blocks at the side of the boat This week we successfully deployed the blocks in their appropriate location. Last week we had a Gps problem and the blocks were put in manually. After the locations was entered on Google maps it was far from where it was supposed to be  so this week’s mission was to relocate them to the original positions. After some hard work we deployed the six blocks for the fishermen’s cove trail. Sheril and Lisanne getting ready to go below! The team was really determined to get it done properly and quickly so the job was separated by the four team members. We had Savy as the Gps navigator, leading us to the locations of where the blocks were and then moving them to the given locations. We had Marie as the snorkeler, once we have found the position she had to go in and fine a nice sandy patch to deploy the blocks as well as dropping a surface marker buoy so that the boat can approach...